Sterling 61051100-0 Guía de instalación Pagina 6

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 5
Construct the Drop-In/Island Framing (cont.)
NOTE: The subfloor must be no lower than 16-1/2 (41.9 cm) below the masonry island. The subfloor
installation should allow 1/16 (2 mm) clearance for sealant between the island and the lower rim of the
empty bath.
Construct the island of brick or concrete.
Add tile or other finish material, leaving a 1/16 (2 mm) clearance for sealant between the island
and the rim of the bath.
1019810-2-C 6 Sterling
Vista de pagina 5
1 2 3 4 5 6 7 8 9 10 11 ... 39 40

Comentarios a estos manuales

Sin comentarios